skip to main contentskip to navigation

Drafting 3

Current Assignments

Wooden Bridge Building

Date Assigned: 01/04/2017

Date Due: 01/18/2017

Some of the Drafting 3 students will be working on a wooden scaled bridge design. The specifications they will be using were designed by the 2017 International Bridge Building Contest. Strict building sizes must be followed in order to test your bridge.


Past Due Assignments

Stone Wall Drawing

Date Assigned: 10/14/2016

Date Due: 10/17/2016

Students will design and draw a stone wall drawing using a 10" x 24" footer with a standard keyway 

 

Regional Bridge Building

Date Assigned: 10/25/2016

Date Due: 10/31/2016

Students can design and construct a wooden scaled bridge which can be entered in the regional contest to be held in Feb. The top three wooden bridges will be sent to our local competition with a chance of moving to the International contest to be held in Dallas, Texas

The contest will be on TBA

Final three VV winners will be submitted to Regional director.

 

Computer AutoCad drawings

Date Assigned: 12/07/2016

Date Due: 12/22/2016

Students will be working on various drawings using the AutoCad software on the computers. They will print out final computer drawings to be graded and kept in their project folders.